Bridgwater Tidal Barrier - Transport & Works Act Order application


The Environment Agency submitted an application for a Transport and Works Act Order (TWAO) to the Secretary of State, Defra in December 2019 and comments and representations were invited via Defra.

The Environment Agency and Sedgemoor District Council have been working together to develop proposals for a tidal barrier to reduce tidal flood risk in Bridgwater.

The scheme will better protect at least 11,300 homes and 1,500 businesses from the risk of tidal flooding in Somerset. It permits substantial numbers of new homes to be built and encourages new business investment.  

We propose to:

  • Build a tidal surge barrier across the River Parrett between Express Park and Chilton Trinity to help better manage tidal flood risk to Bridgwater.

  • Improve the flood defences downstream of the barrier. We will do this by increasing the height of the existing riverside flood banks in some areas. Elsewhere we would build new flood banks to increase protection to villages.

In order to progress with the scheme, the Environment Agency requires consent from the Secretary of State for the Department of Environment, Food and Rural Affairs (Defra) for an Order under the Transport and Works Act 1992 (TWAO) and an associated request for planning permission pursuant to section 90(2A) of the Town and Country Planning Act 1990. Orders under the Transport and Works Act 1992 can authorise certain infrastructure projects in England and Wales.

In December 2019 the Environment Agency applied to the Secretary of State for Environment, Food and Rural Affairs under section 6 of the Transport and Works Act 1992 for the Bridgwater Tidal Barrier Order to be made under sections 3(1)(b) and 5 of that Act. The TWAO is required to give the Environment Agency the range of legal powers required to build the scheme, including the ability to close the navigable waterway when the barrier is operated.

Putting the scheme into practice could mean implementing changes that would affect people in the local area. Because of this, applications for TWAOs have to follow a set procedure which allows people to give their views on the proposals. Comments and representations were invited via Defra. The period for statements of support, representations and objections has now ended.

TWAO Update - August 2020

Notification has now been received that on 31 July the Secretary of State determined that the examination of the application for a Transport & Works Act Order (TWAO) in respect of the Scheme will proceed by the written representations process;

"I am writing to inform you that the Secretary of State for Environment has decided that, at present, it is not necessary to hold an inquiry or hearing in this case. It is our understanding that the remaining statutory objectors who have a right to be heard at a public inquiry have indicated that the written representation procedure is acceptable to them. We are satisfied, therefore, that the issues raised by this application and the outstanding objections, including outstanding representations, to it can be adequately presented and examined through the written representations procedure. This procedure, as set out in rule 24 of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 ("the Applications Rules"), will therefore apply with effect from the date of this letter."

DEFRA will be writing to all objectors to explain the written representation procedure and the timescales for providing representations or any additional requested information.

The project team welcomes this decision and hopes that it will be possible to complete the written representations process as soon as practicable, to enable the Scheme to move forward.

All the TWAO application documents are available to view and download on this webpage (below).

Application Documents

The application documents are available to download in the table below. At the end of the table there is also the opportunity to download all the application documents as one single zip file.

Volume

Document DescriptionLink to Document
A1 Application LetterApplication LetterA1 Application Letter [0.5MB]
A2 Draft OrderDraft OrderA2 Draft Order [1MB]
A3 Explanatory MemorandumExplanatory MemorandumA3 Explanatory Memorandum [0.5MB]
A4 Concise Statement of AimsConcise Statement of AimsA4 Concise Statement of Aims [0.5MB]
A5 Consultation ReportConsultation Report (including Appendices)A5 Consultation Report [9MB]
A6 Declaration as to StatusDeclaration as to StatusA6 Declaration as to status [0.5MB]
A7 List of ConsentsList of ConsentsA7 List of Consents [0.5MB]
A8 Estimate of CostsEstimate of costsA8 Estimate of costs [0.5MB]
A9 Funding StatementFunding StatementA9 Funding Statement [0.5MB]
A10 Section 90(2A) Planning Direction ApplicationSection 90(2A) Planning Direction Application (including Appendices)A10 Section 90(2A) Planning Direction Application [1MB]
A11 Scoping OpinionScoping OpinionA11 Scoping Opinion [1MB]
A12 Planning StatementPlanning StatementA12 Planning Statement [1.5MB]
A13 Design & Access StatementDesign & Access StatementA13 Design & Access Statement [3MB]
A14-1 Order Plans Volume 1A14-1 Cover Sheet and ContentsA14-1 cover sheet [0.5MB]
Land Plans Key Plan 1 (of 3) and Sheets 1 to 8 (of 18)Land Plans Key Plan 1 (of 3) and Sheets 1 to 8 (of 18) [15.5MB]
Land Plans Key Plan 2 (of 3) and Sheets 9 to 12 (of 18)Land Plans Key Plan 2 (of 3) and Sheets 9 to 12 (of 18) [10.5MB]
Land Plans Key Plan 3 (of 3) and Sheets 13 to 18 (of 18)Land Plans Key Plan 3 (of 3) and Sheets 13 to 18 (of 18) [13.5MB]
Works Plans Overall Location PlanWorks Plans Overall Location Plan [3MB]
Works Plans Key Plan 1 (of 3)Works Plans Key Plan 1 (of 3) [15MB]
Works Plans Sheets 1 to 8 (of 20)Works Plans Sheets 1 to 8 (of 20) [15MB]
Works Plans Key Plan 2 (of 3)Works Plans Key Plan 2 (of 3) [12MB]
Works Plans Sheets 9 to 15 (of 20)Works Plans Sheets 9 to 15 (of 20) [14MB]
Works Plans Key Plan 3 (of 3)Works Plans Key Plan 3 (of 3) [12.5MB]
Works Plans Sheets 16 to 18 (of 20)Works Plans Sheets 16 to 18 (of 20) [10MB]
Works Plans Sheets 19 to 20 (of 20)Works Plans Sheets 19 to 20 (of 20) [9MB]
Cross Sections Sheets 1 to 17 (of 17)Cross Sections Sheets 1 to 17 (of 17) [12MB]
Long Sections Sheets 1 to 7 (of 7)Long Sections Sheets 1 to 7 (of 7) [5MB]
A14-2 Order Plans Volume 2A14-2 Cover Sheet and ContentsA14-2 cover sheet [0.5MB]
Location Plans Overall Location PlanLocation Plans Overall Location Plan [3MB]
Location Plans Key Plan 1 (of 3)Location Plans Key Plan 1 (of 3) [14.5MB]
Location Plans Key Plan 2 (of 3)Location Plans Key Plan 2 (of 3) [11.5MB]
Location Plans Key Plan 3 (of 3)Location Plans Key Plan 3 (of 3) [12.5MB]
Location Plans Sheets 1 to 8 (of 20)Location Plans Sheets 1 to 8 (of 20) [ 13.5MB]
Location Plans Sheets 9 to 15 (of 20)Location Plans Sheets 9 to 15 (of 20) [12MB]
Location Plans Sheets 16 to 20 (of 20)Location Plans Sheets 16 to 20 (of 20) [9.5MB]
Public Rights of Way Plans Overall Location PlanPublic Rights of Way Plans Overall Location Plan [3MB]
Public Rights of Way Plans Key Plan 1 (of 3)Public Rights of Way Plans Key Plan 1 (of 3) [14.5MB]
Public Rights of Way Plans Key Plan 2 (of 3)Public Rights of Way Plans Key Plan 2 (of 3) [11.5MB]
Public Rights of Way Plans Key Plan 3 (of 3)Public Rights of Way Plans Key Plan 3 (of 3) [13MB]
Public Rights of Way Plans Sheets 1 to 6 (of 15)Public Rights of Way Plans Sheets 1 to 6 (of 15) [14.5MB]
Public Rights of Way Plans Sheets 7 to 12 (of 15)Public Rights of Way Plans Sheets 7 to 12 (of 15) [11MB]
Public Rights of Way Plans Sheets 13 to 15 (of 15)Public Rights of Way Plans Sheets 13 to 15 (of 15) [15MB]
A15 Book of ReferenceBook of ReferenceA15 Book of Reference [1MB]
A16 Planning Direction DrawingsA16 Cover Sheet and ContentsA16 cover sheet [0.5MB]
Barrier and Downstream Defences Overview, Site Location Plans Sheets 1 to 6Barrier and Downstream Defences Overview, Site Location Plans Sheets 1 to 6 [13.5MB]
Barrier and Express Park DrawingsBarrier and Express Park Drawings [9MB]
Downstream Defences Drawings (including borrow)Downstream Defences Drawings (including borrow) [6.5MB]
Enabling Works, Compounds and Access, Navigation SignsEnabling Works, Compounds and Access, Navigation Signs [13.5MB]
Works Overview for South Somerset Council (Eel Pass Location Plan)Works Overview for South Somerset Council (Eel Pass Location Plan) [11MB]
Eel Pass Concept PlansEel Pass Concept Plans [7.5MB]
Works Overview for Somerset West and Taunton Council (Fish Pass Location Plan)Works Overview for Somerset West and Taunton Council (Fish Pass Location Plan) [12MB]
Fish Pass Concept PlansFish Pass Concept Plans [7.5MB]
A17-1a Environmental Statement Volume 1ES Contents and Statement of CompetenceContents & Statement of competence [2MB]
ES Chapter 1: IntroductionChapter 1 [1MB]
ES Appendix 1A: Scoping Opinions and Environment Agency responseAppendix 1A [1.5MB]
ES Chapter 2: BackgroundChapter 2 [5.5MB]
ES Chapter 3: Legislation and Planning PolicyChapter 3 [1.5MB]
ES Chapter 4: AlternativesChapter 4 [2MB]
ES Appendix 4A: Options PlansAppendix 4A [3.5MB]
ES Chapter 5: Consultation summary and future consultation activitiesChapter 5 [1MB]
ES Chapter 6: Proposed SchemeChapter 6 [8MB]
ES Appendix 6A: Landscape Master Plans (Part 1 of 3)Appendix 6A Part 1 of 3 [16.5MB]
ES Appendix 6A: Landscape Master Plans (Part 2 of 3)Appendix 6A Part 2 of 3 [19MB]
ES Appendix 6A: Landscape Master Plans (Part 3 of 3)Appendix 6A Part 3 of 3 [10MB]
ES Appendix 6B: General arrangement drawing for tidal barrierAppendix 6B [1MB]
ES Appendix 6C: Typical Borrow Pit DetailsAppendix 6C [0.5MB]
ES Appendix 6D: Arboricultural Impact Assessment Barrier and DSDSAppendix 6D [ 6MB]
ES Appendix 6E: Details of plant and machinery used during constructionAppendix 6E [1MB]
ES Appendix 6F: Guiding Principles for downstream defences works that affect land drainageAppendix 6F [0.5MB]
ES Appendix 6G: Hydraulic Modelling ReportAppendix 6G [15MB]
ES Appendix 6H: Barrier Morphological Impact using Regime Theory, Technical MemorandumAppendix 6H [2MB]
ES Appendix 6J: Short-term siltation effects (HR Wallingford)Appendix 6J [1MB]
ES Chapter 7: Environmental Assessment MethodologyChapter 7 [1MB]
ES Chapter 8: Water & GeomorphologyChapter 8 [5.5MB]
ES Appendix 8A: WFD Compliance AssessmentAppendix 8A [6MB]
ES Appendix 8B: Geomorphological Baseline ReportAppendix 8B [3.5MB]
ES Appendix 8C: Adaptive Environmental Management PlanAppendix 8C [1MB]
ES Appendix 8D: Bridgwater Tidal Barrier Estuary Monitoring PlanAppendix 8D [1.5MB]
ES Chapter 9: BiodiversityChapter 9 [3MB]
A17-1b Environmental Statement Volume 2ES Appendix 9A: Survey Reports (Part 1 of 3)Appendix 9A Part 1 of 3 [4.5MB]
ES Appendix 9A: Survey Reports (Part 2 of 3)Appendix 9A Part 2 of 3 [22MB]
ES Appendix 9A: Survey Reports (Part 3 of 3)Appendix 9A Part 3 of 3 [3MB]
ES Appendix 9B: Baseline PlansAppendix 9B [6MB]
ES Appendix 9C: Phase 1 Habitat Survey (P1HS) PlansAppendix 9C [6.5MB]
ES Appendix 9D: Shadow Habitats Regulations Assessment (HRA)Appendix 9D - Report [10MB]
ES Appendix 9D - App A: Scheme Overview PlanAppendix 9D - App A [1.5MB]
ES Appendix 9D - App B: Tidal Barrier DrawingsAppendix 9D - App B [1MB]
ES Appendix 9D - App C: Borrow Pit Indicative DetailsAppendix 9D - App C [0.5MB]
ES Appendix 9D - App D: Sketches and Photographs Illustrating Natural Variation of SedimentAppendix 9D - App D [4MB]
ES Appendix 9D - App E: Impact of tidal barrier closures on flowsAppendix 9D - App E [0.5MB]
ES Appendix 9D - App F: Designated Site PlanAppendix 9D - App F [6.5MB]
ES Appendix 9D - App G: Designated site citationsAppendix 9D - App G [16MB]
ES Appendix 9D - App H: BTB Passage and Wintering Bird Survey ReportAppendix 9D - App H [24.5MB]
ES Appendix 9D - App J: WeBS data and Sector Location PlanAppendix 9D - App J [3.5MB]
ES Appendix 9E: Assessment of Effects on BatsAppendix 9E [5MB]
ES Appendix 9F: Hedgerow Survey TableAppendix 9F [3.5MB]
ES Appendix 9G: Aquatic Baseline ReportAppendix 9G [1.5MB]
ES Appendix 9H: Fish Survey ReportAppendix 9H [1MB]
ES Appendix 9J: Key Biodiversity Policy/LegislationAppendix 9J [0.5MB]
A17-1c Environmental Statement Volume 3ES Chapter 10: Landscape CharacterChapter 10 [12.1MB]
ES Appendix 10A: LVIA MethodologyAppendix 10A [1.5MB]
ES Chapter 11: Visual Amenity (Part 1 of 2)Chapter 11 Part 1 of 2 [25MB]
ES Chapter 11: Visual Amenity (Part 2 of 2)Chapter 11 Part 2 of 2 [19.5MB]
ES Appendix 11A: Visual Amenity Assessment TablesAppendix 11A [1MB]
ES Appendix 11B: Photographic ReportAppendix 11B [128MB]
ES Appendix 11B: Photographic Report (Low resolution version)Appendix 11B Low Res [11MB]
ES Chapter 12: Land UseChapter 12 [8.5MB]
ES Chapter 13: Population & Human HealthChapter 13 [12MB]
ES Appendix 13A: Noise AssessmentAppendix 13A [2MB]
ES Appendix 13B: Flood Risk AssessmentAppendix 13B - Report [1.5MB]
ES Appendix 13B - App A: Flood Risk Assessment Appendix A (Part 1 of 4)Appendix 13B - App A - Part 1 of 4 [32.5MB]
ES Appendix 13B - App A: Flood Risk Assessment Appendix A (Part 2 of 4)Appendix 13B - App A - Part 2 of 4 [23MB]
ES Appendix 13B - App A: Flood Risk Assessment Appendix A (Part 3 of 4)Appendix 13B - App A - Part 3 of 4 [17MB]
ES Appendix 13B - App A: Flood Risk Assessment Appendix A (Part 4 of 4)Appendix 13B - App A - Part 4 of 4 [33MB]
ES Chapter 14: NavigationChapter 14 [9MB]
ES Appendix 14A: Navigation Risk AssessmentAppendix 14A - Report [3.5MB]
ES Appendix 14A: Navigation Risk Assessment Apps A-CAppendix 14A - Apps A-C [8.5MB]
ES Appendix 14B: Gate Width Assessment Technical NoteAppendix 14B [3.5MB]
ES Appendix 14C: Temporary Bypass ChannelAppendix 14C [1.5MB]
A17-1d Environmental Statement Volume 4ES Chapter 15: Archaeology and Cultural HeritageChapter 15 [13.5MB]
ES Appendix 15A: Cultural Heritage Desk Based AssessmentAppendix 15A [20MB]
ES Appendix 15B: Options 4 and 5 Archaeological Watching BriefAppendix 15B [5.5MB]
ES Appendix 15C: Historical Environment Desk Based Assessment - Downstream DefencesAppendix 15C [7.5MB]
ES Appendix 15D: Borrow Fields Geophysical Survey ReportAppendix 15D [8.5MB]
ES Appendix 15E: Impact Tables for High Value Designated Assets within the 10km Study AreaAppendix 15E [0.5MB]
ES Chapter 16: Traffic and TransportChapter 16 [10MB]
ES Appendix 16A: Transport AssessmentAppendix 16A - Report [2.5MB]
ES Appendix 16A - App A: Scheme OverviewAppendix 16A - App A [1.5MB]
ES Appendix 16A - App B: Scoping Notes (Part 1 of 2)Appendix 16A - App B Part 1 of 2 [19MB]
ES Appendix 16A - App B: Scoping Notes (Part 2 of 2)Appendix 16A - App B Part 2 of 2 [20MB]
ES Appendix 16A - App C: Study AreaAppendix 16A - App C [20MB]
ES Appendix 16A - App D: Footpaths and PRoWAppendix 16A - App D [4.5MB]
ES Appendix 16A - App E: Collision Data and MapsAppendix 16A - App E [12MB]
ES Appendix 16A - App F: Traffic CountsAppendix 16A - App F [8.5MB]
ES Appendix 16A - App G: Network DiagramsAppendix 16A - App G [1.5MB]
ES Appendix 16A - App H: Vehicle Tracking DrawingsAppendix 16A - App H [8.5MB]
A17-1e Environmental Statement Volume 5ES Chapter 17: Soil, Ground Conditions and ContaminationChapter 17 [9MB]
ES Appendix 17A: Detailed Geological and Geo-environmental Appraisal of Shortlisted Sites (Part 1 of 3)Appendix 17A Part 1 of 3 [31MB]
ES Appendix 17A: Detailed Geological and Geo-environmental Appraisal of Shortlisted Sites (Part 2 of 3)Appendix 17A Part 2 of 3 [17MB]
ES Appendix 17A: Detailed Geological and Geo-environmental Appraisal of Shortlisted Sites (Part 3 of 3)Appendix 17A Part 3 of 3 [20MB]
ES Appendix 17B: Option 5 Ground Investigation ReportAppendix 17B [19.5MB]
ES Appendix 17C: Downstream Flood Defences Desk Study (Part 1 of 3)Appendix 17C Part 1 of 3 [26MB]
ES Appendix 17C: Downstream Flood Defences Desk Study (Part 2 of 3)Appendix 17C Part 2 of 3 [21MB]
ES Appendix 17C: Downstream Flood Defences Desk Study (Part 3 of 3)Appendix 17C Part 3 of 3 [23MB]
A17-1f Environmental Statement Volume 6ES Chapter 18: Upstream Fish and Eel PassageChapter 18 [5.5MB]
ES Appendix 18A: Summary Fish Pass Mitigation OptionsAppendix 18A [7.5MB]
ES Appendix 18B: Salmonid Habitat Assessment Report of the River ToneAppendix 18B [3.5MB]
ES Appendix 18C: Stage 1 Habitat Regulations AssessmentsAppendix 18C [16.5MB]
ES Appendix 18D: Water Framework Directive Assessments (Part 1 of 2)Appendix 18D Part 1 of 2 [17MB]
ES Appendix 18D: Water Framework Directive Assessments (Part 2 of 2)Appendix 18D Part 2 of 2 [17.5MB]
ES Appendix 18E: Scheme DrawingsAppendix 18E [1MB]
ES Appendix 18F: Phase 1 Habitat MappingAppendix 18F [14MB]
ES Appendix 18G: Bradford on Tone Summary Bat ReportAppendix 18G [1.5MB]
ES Appendix 18H: Bradford on Tone Tree SurveyAppendix 18H [2.5MB]
A17-1g Environmental Statement Volume 7ES Chapter 19: In-combination EffectsChapter 19 [3.5MB]
ES Appendix 19A: Record of Scoping of ProjectsAppendix 19A [0.5MB]
ES Chapter 20: Environmental OpportunitiesChapter 20 [1MB]
ES Chapter 21: Summary and ConclusionsChapter 21 [1MB]
ES Appendix 21A: Mitigation Action PlanAppendix 21A [1MB]
ES Chapter 22: Environmental Action PlanChapter 22 [1MB]
ES Chapter 23: ReferencesChapter 23 [1MB]
ES Chapter 24: GlossaryChapter 24 [0.5MB]
ES Chapter 25: AbbreviationsChapter 25 [0.5MB]
A17-2 Environmental Statement NTSES Non-Technical SummaryNon-Technical Summary [3.5MB]
A18 Reduced Size Order Plans and Planning Direction DrawingsFor Order Plans and Planning Direction Drawings please refer to Volumes A14-1, A14-2 and A16 (above)

N/A

As well as downloading/viewing the documents individually we have also made all the application documents available to download as a single zip file. Please note that this file is very large (1.35GB). It may therefore take some time to download and we recommend using a good internet connection.

All TWAO application documents - TWAO Application Documents.zip [1.35GB]

Queries 

If you have a question relating to the scheme then you can email the project team on Bridgwater.Barrier@environment-agency.gov.uk. Please DO NOT use this email address to send representations as all representations must be sent to Defra.

This animation provides an indicative visualisation of the Bridgwater tidal barrier. However, it does not form part of the TWAO application.

Bridgwater Tidal Barrier - Background Information

The page includes background information on the Bridgwater Tidal Barrier, including previous consultation material and documents prepared prior to submission on the Transport and Works Act application.